iPad Posting

this is a test to see if I can post pics directly from my iPad.  If it works you just may see more frequent posts.  I’m also trying Google Photo to serve the pics.

Here’s a recent pic of Sjogin in her slip.  I think Tuesday will be rigging day.

  

I think it works!

It does work!  Click on the image for a larger size.

Beaton pics next.

Still Ice Bound

Signs of Spring are out there but you have to look under the snow. Sjogin’s still resting comfortably in her ice berth. There’s signs of open water but the Bay’s still frozen solid south of Curtis Point. Spar work begins next week with the assembling of the various bits and cleaning up the mast and boom tracks. And then on to the other long pending work.

Here are a few recent pics:

Reflective water

An inch of water over the ice makes for nice reflections. And just an inch or so of ice in the bilge.


Open water?

You can just make out a strip of open water over by the Mantoloking shore. It will take a while for the basin to open up. Maybe in time for stepping the mast.


Yet again

Yet another snow storm. I think this one was named Thor. Which I am from shoveling.

Hang in there fellow Northeasterners. The Osprey, crocuses and such harbingers of Spring are just around the corner.

Another month’s gone by

and I’m feeling guilty about the lack of of a new post.

Here’s a few quick pics of Sjogin in the shed being very slowly prepared for painting. I’m starting from the house down because if the hull get’s done first there’s always the temptation to finish the deck and house painting “when it’s in the water”.

Progress
Sealer has been applied to all the bare wood. (From the deck up so far.)


tempting
Though the new wood looks fine bright, it was always meant to be painted. The hatch frame will remain varnished.

The only new wood to be varnished will be the rub rails. They have two coats of sealer on them now and will have a few more coats of varnish before the bronze half oval is installed.


New sole
Heres the first two planks of the cockpit sole, more to follow.

And more progress pics as well. Eventually….

And a few more mostly Beaton’s pics

I’ve started using an application called Flicstaker to upload photos to Flickr. It’s pretty easy to use which should result in more pics here.


Family members
The dinghy is a Columbia Model designed by Nathaniel G. Herreshoff. I had the pleasure of helping Tom build her in the early 80’s. The ugly duckling is Speedwell, ready for some late season Duckboating. Now that the major work at home’s been completed, she’ll be trucked home. She could be sailed home absent the Point Pleasant Canal. Hmmm. Maybe next year. We’ll see how we do with Stockton Lake and the fixed bridges. Glimmerglass here I come.


SASAIC
Taken by Kent Mountford last week. Again sailing as slow as I can.


Clean
That’s one way of cleaning the shop. A fresh coat of floor paint is applied in stages. Perhaps it’s being done in honor of Sjogin’s pending visit?


New outfeed table
More change. After 30 or so years, the outfeed table for the band saw has been replaced.


Table pivot
And a pivoting support for the table. The pivot is on the same axis as the band saw. Tres clever.


Thirty Years Young
Hard to believe that it’s been thirty years or so since I helped Tom build this gem. Light use and careful storage make for a long life.


Lark before the storm
Lark sitting quietly before another squall hits. Busy Summer.

Sjogin video

Last Monday I had the pleasure of having Kent Mountford on board while he was interviewed by Kirk Moore of the Asbury Park Press about the state of Barnegat Bay. Delightful day, sad story. Videographer Tom Costello recorded it all.

We had a nice light breeze from the West that made for a pleasant sail with no drama. We came back to the dock to pump bilges (battery dead) and drop off Tom. We then sailed about in the basin and then out for more of the interview.

Here’s the LINK to the on-line article in the Press including the video. Sjogin did fine in her first “close-up”.

Here’s a pic I took of Kent being interviewed by Kirk:

Kent's interview

Be sure to comment on the article and let them know what you think of Sjogin as a recording studio.

Speedwell progress as well

With the 2010 Duckboat Worlds set for the 27th, I’m sharing my boat work time between Sjogin and Speedwell. Our 1950? Phil Clarke Duckboat had a new keel, centerboard case and mast step renewed this past winter. Prior posts here and here. Of course Speedwell’s been sitting in a shed waiting to be painted and rigged since April. Must be something in the water at Beaton’s.


The Work increases
Doubling my fun. The bottom needs a lot of attention after her surgery and general tightening up.


Same color scheme
When done she’ll be painted Malachy Green on the bottom and coamings, Seattle Grey decks and Slate Grey inside the hull. All paints will be low gloss Kirby paints. And all are Sjogin colors.


Inspection tour
We had Phil Heffernan, one of our imaginary friends, down last weekend for a visit. An inspection tour of Beaton’s is always on the list. He’s starting a Blog that should be photo rich as Phil’s a Professional.